Construction Company Software
com.construction-company-software/mcp
Construction scheduling and project management: jobs, schedules, subs, budgets, RFIs, daily logs
Is this your project? Claim this entry to answer questions, hear about reviews and appear as the author.
- Repository
- github.com/constructioncompanysoftware/mcp
- Website
- www.construction-company-software.com/ai/mcp
- Server address
https://www.construction-company-software.com/api/mcp(streamable-http)- Version
- 1.1.0
- Author
- construction-company-software.com (namespace verified by the registry)
- Source
- Official MCP registry (updated Nov 22, 2026)
Reviews
No review yet.
Sign in to leave a review. Your email is all you need.
Questions for the author
No question yet.
Sign in to ask the author a question. The author has not claimed this entry yet: they will only be told if they claim it. Other members can answer.
How to install it
Claude Code
In a terminal:
claude mcp add --transport http mcp https://www.construction-company-software.com/api/mcpClaude (app and claude.ai)
Open Settings, then Connectors, and add a custom connector with this address. If the server asks you to sign in, Claude will walk you through it.
https://www.construction-company-software.com/api/mcpChatGPT
In Settings, Apps & Connectors section, turn on developer mode, then create a connector with this address.
https://www.construction-company-software.com/api/mcpCursor ~/.cursor/mcp.json
Add this to ~/.cursor/mcp.json (or .cursor/mcp.json in the project):
{
"mcpServers": {
"mcp": {
"url": "https://www.construction-company-software.com/api/mcp"
}
}
}VS Code .vscode/mcp.json
Add this to your project’s .vscode/mcp.json:
{
"servers": {
"mcp": {
"type": "http",
"url": "https://www.construction-company-software.com/api/mcp"
}
}
}These configurations are built from the information published by the author. Check the repository before installing a local server.
Our test
Responds The server speaks MCP and lists its tools.
- Date
- Nov 28, 2026, 09:49 (test run by L’Atlas)
- Response time
- 972 ms (whole test)
- Tools found
- 17
- Announced name
- construction-company-software 1.1.0
- Protocol
- MCP 2025-11-25
- Next test
- Dec 5, 2026
See the tools (17)
list_projects
List the company's projects with status, dates and progress. Use first when the user hasn't said which project.search
Keyword search across projects, tasks, contacts, files, RFIs, punch items and indexed documents.get_schedule
A project's tasks with dates, status, % complete, float, critical flag and assigned subs. Filter by a date window or task name.critical_path
The chain of tasks that drives the project's finish date (zero or negative float), in order.float_report
Tasks with little or negative float (slack) — how many workdays each can slip before it delays the finish.schedule_delays
Why the schedule moved: recent date changes with who/why (delay reason), plus baseline and target variance.sub_status
Which subcontractors are booked on which tasks and whether they confirmed, declined, proposed a new date or haven't answered.budget_status
Budget vs. actual by cost code: revised budget, committed, actual, projected, variance, contract, billed and projected profit.list_rfis
RFIs for a project with status, ball-in-court, due date, overdue flag and the answer if any.daily_logs
Daily logs in a date range: work performed, crew counts, delays, weather and notes.punch_list
Punch, issue and to-do items for a project with status, trade, assignee and due date.list_submittals
Submittals with status, spec section, required-by task and date warnings (approval too late for lead time).search_documents
Find passages in the project's indexed specs, drawings and RFIs that answer a question. Returns excerpts with page numbers to cite.schedule_risks
Rule-based risk list for the next 7 days: late work, unconfirmed or declined subs, weather on outdoor work, negative float, overdue RFIs and punch items.propose_schedule_changes
Propose edits to EXISTING tasks (move dates, change duration, set progress/status, add or remove links, add a task). Nothing changes until a person approves the proposal. Describe the change in `request`; optionally give exact `edits`.draft_rfi
Draft an RFI (subject, question, suggested solution) from notes, using the project's specs and schedule. Saved as a proposal; a person approves it to create the RFI as a draft.apply_proposal
Apply a pending proposal (schedule change, RFI draft, punch items). ONLY call this after the user has explicitly approved that exact proposal; pass confirm=true. Unless the API key allows direct apply, this returns an approval link the user
Previous tests
| Nov 28, 2026 | Responds | 972 ms | 17 tools |
| Nov 28, 2026 | Responds | 279 ms | 17 tools |
What the test does: it opens an MCP session (initialize) and asks for the tool list (tools/list), with no key or account. No tool is ever called. Learn more
Cite this entry
For an article or comparison, use this permanent link and include the test date. The description comes from its source; reviews belong to members. A successful test is not a security audit.
Construction Company Software · L’Agora · Tested on
[Construction Company Software — L’Agora](https://lagora.dev/en/entry/com.construction-company-software/mcp)
Comments
No comment yet. A question, a tip? Start the discussion.
Sign in to comment.
Badge for your README
Show that your project is listed (and tested, if it responds): paste this code in your README. The badge follows the latest test and links back to this entry.
Markdown (GitHub)
[](https://lagora.dev/en/entry/com.construction-company-software/mcp)HTML
<a href="https://lagora.dev/en/entry/com.construction-company-software/mcp"><img src="https://lagora.dev/badge/com.construction-company-software/mcp.svg?lang=en" alt="com.construction-company-software/mcp on L’Agora" height="20"></a>For the entry’s author only: sign in to continue.