Portravo Construction Takeoff
com.portravo/construction-takeoff
Preflight approved takeoffs with existing credits; review source gaps and export reviewed estimates.
Is this your project? Claim this entry to answer questions, hear about reviews and appear as the author.
- Website
- portravo.com/developers/mcp
- Server address
https://portravo.com/mcp(streamable-http)- Version
- 1.1.0
- Author
- portravo.com (namespace verified by the registry)
- Source
- Official MCP registry (updated Nov 2, 2026)
Reviews
No review yet.
Sign in to leave a review. Your email is all you need.
Questions for the author
No question yet.
Sign in to ask the author a question. The author has not claimed this entry yet: they will only be told if they claim it. Other members can answer.
How to install it
Claude Code
In a terminal:
claude mcp add --transport http construction-takeoff https://portravo.com/mcpClaude (app and claude.ai)
Open Settings, then Connectors, and add a custom connector with this address. If the server asks you to sign in, Claude will walk you through it.
https://portravo.com/mcpChatGPT
In Settings, Apps & Connectors section, turn on developer mode, then create a connector with this address.
https://portravo.com/mcpCursor ~/.cursor/mcp.json
Add this to ~/.cursor/mcp.json (or .cursor/mcp.json in the project):
{
"mcpServers": {
"construction-takeoff": {
"url": "https://portravo.com/mcp"
}
}
}VS Code .vscode/mcp.json
Add this to your project’s .vscode/mcp.json:
{
"servers": {
"construction-takeoff": {
"type": "http",
"url": "https://portravo.com/mcp"
}
}
}These configurations are built from the information published by the author. Check the repository before installing a local server.
Our test
Responds The server speaks MCP and lists its tools.
- Date
- Nov 28, 2026, 08:49 (test run by L’Atlas)
- Response time
- 4,131 ms (whole test)
- Tools found
- 10
- Announced name
- portravo 1.1.0
- Protocol
- MCP 2025-11-25
- Next test
- Dec 5, 2026
See the tools (10)
preflight_takeoff
Before creating or starting a takeoff, inspect current automatic/team-assisted trades, the exact existing-credit requirement, balance, upload limits, published prices and review link. Supply either project_id or proposed trades, or neitherget_takeoff_status
Read an owned project and its latest asynchronous takeoff progress, completion limitations and review link. Never advances or restarts a run, uses credits or changes billing. Poll this tool after run_takeoff returns a running result. lineCoget_profile
Returns the connected Portravo account's id, name and email. Useful only when the user asks which Portravo account is connected or you need the account email. Read-only; it does not list projects or show takeoff credits (preflight_takeoff rlist_projects
Find construction projects in the connected Portravo account, including draft, review, priced and final estimates. Returns 50 projects per page; nextOffset is the offset of the next page, or null on the last page.get_takeoff
Read an owned construction project's plan files (attached from chat or uploaded in Portravo) and extracted takeoff quantities, trades, confidence and human review status. reviewRequired reports whether any line still needs estimator review.list_pricing_markets
List the regional construction pricing markets supported by Portravo. The returned markets are the accepted metro_code values for create_project. Works before account linking (the standard markets by code, name and state, marked accountLinkcreate_project
Create a new construction estimate project in the connected Portravo account from a project name, an explicit trades selection returned by preflight_takeoff, an optional address and an optional supported metro_code. Trades are required. Repattach_plan_pdf
Attach a PDF the user selected in this conversation as the first plan for a new Portravo project. Plan PDFs must be 10 MiB or smaller. Accepts exactly one of plan, a host-provided download_url and file_id, or plan_inline, canonical base64 orun_takeoff
Start a takeoff for an owned project with a plan attached through attach_plan_pdf or uploaded by the user on the project page. Run preflight_takeoff first and obtain the user's approval of the selected trades and credit cost. Set confirmed_export_reviewed_estimate
Get a short-lived Excel XLSX download for an owned Portravo estimate after every takeoff line has been reviewed and the estimate is priced or final. If review is incomplete, the call returns a review_required error with the Portravo review
What the test does: it opens an MCP session (initialize) and asks for the tool list (tools/list), with no key or account. No tool is ever called. Learn more
Cite this entry
For an article or comparison, use this permanent link and include the test date. The description comes from its source; reviews belong to members. A successful test is not a security audit.
Portravo Construction Takeoff · L’Agora · Tested on
[Portravo Construction Takeoff — L’Agora](https://lagora.dev/en/entry/com.portravo/construction-takeoff)
Comments
No comment yet. A question, a tip? Start the discussion.
Sign in to comment.
Badge for your README
Show that your project is listed (and tested, if it responds): paste this code in your README. The badge follows the latest test and links back to this entry.
Markdown (GitHub)
[](https://lagora.dev/en/entry/com.portravo/construction-takeoff)HTML
<a href="https://lagora.dev/en/entry/com.portravo/construction-takeoff"><img src="https://lagora.dev/badge/com.portravo/construction-takeoff.svg?lang=en" alt="com.portravo/construction-takeoff on L’Agora" height="20"></a>For the entry’s author only: sign in to continue.