Remote MCP server for data-center siting, ISO queues, and grid and capital data.

Website
map.aixenergy.io/mcp
Server address
https://map.aixenergy.io/mcp (streamable-http)
Version
3.4.0
Author
aixenergy.io (namespace verified by the registry)
Source
Official MCP registry (updated Nov 19, 2026)

How to install it

The server optionally accepts a header: Authorization. Replace YOUR_KEY with your key.

Claude Code

In a terminal:

claude mcp add --transport http map https://map.aixenergy.io/mcp \
  --header "Authorization: Bearer YOUR_KEY"
Claude (app and claude.ai)

Open Settings, then Connectors, and add a custom connector with this address. If the server asks you to sign in, Claude will walk you through it.

https://map.aixenergy.io/mcp
ChatGPT

In Settings, Apps & Connectors section, turn on developer mode, then create a connector with this address.

https://map.aixenergy.io/mcp
Cursor ~/.cursor/mcp.json

Add this to ~/.cursor/mcp.json (or .cursor/mcp.json in the project):

{
  "mcpServers": {
    "map": {
      "url": "https://map.aixenergy.io/mcp",
      "headers": {
        "Authorization": "Bearer YOUR_KEY"
      }
    }
  }
}
VS Code .vscode/mcp.json

Add this to your project’s .vscode/mcp.json:

{
  "servers": {
    "map": {
      "type": "http",
      "url": "https://map.aixenergy.io/mcp",
      "headers": {
        "Authorization": "Bearer YOUR_KEY"
      }
    }
  }
}

These configurations are built from the information published by the author. Check the repository before installing a local server.

Our test

Responds The server speaks MCP and lists its tools.

Date
Nov 28, 2026, 11:21 (test run by L’Atlas)
Response time
880 ms (whole test)
Tools found
19
Announced name
aixenergy-unified-intelligence 3.5.0
Protocol
MCP 2024-11-05
Next test
Dec 5, 2026
See the tools (19)
  • underwrite_large_load_asset
    Returns a full multi-domain underwriting report for a project or site, covering substation headroom, queue status, nodal power prices, equipment lead times, and capital commitments. Pass any project name, alias, canonical ID, or candidate s
  • screen_regional_capacity
    Evaluates whether a city, county, market, or project area can support a target megawatt load by checking substation headroom, competing queue requests, and active campus developments. Use when comparing markets or screening regional grid ca
  • profile_counterparty
    Returns a company's data center portfolio, operating and planned megawatts, interconnection queue filings, and disclosed capital commitments. Pass a company name, ticker symbol, organization ID, or project name.
  • simulate_grid_to_capital_shock
    Simulates how changes in load MW, transformer lead times, queue cluster backlog, power prices, or interest rates affect a project's energization schedule, completion probability, and financial returns. Pass any project name, alias, ID, or c
  • resolve_pnode_and_electrical_bus
    Maps a project, substation, or location to its nearest ISO/RTO wholesale pricing node (PNode), settlement bus, voltage class, and day-ahead electricity price. Use for power flow modeling and nodal congestion analysis.
  • generate_parametric_8760_profile
    Generates an 8,760-hour annual electrical load profile (real MW, reactive MVAR, apparent MVA, and PUE) for a project or location based on climate, cooling system, and workload type. Pass a project name, ID, state, or IT capacity.
  • assess_site_feasibility
    Evaluates whether a candidate site or project location can support a target MW load, returning time-to-power estimates, composite site scores, nearby substations, water stress, and zoning risks. Pass a city, coordinates, or project name.
  • underwrite_project_and_queue
    Audits a project's announced claims against ISO/RTO interconnection queue filings, study stages, and capital commitments, or searches the queue pipeline. Pass a project name, alias, canonical ID, or ISO/RTO filter.
  • audit_substation_and_upgrades
    Finds high-voltage substations near a project or location and returns transformer MVA ratings, capacity headroom, estimated upgrade costs, and equipment bills of materials. Pass a substation name, project name, city, or coordinates.
  • query_transmission_and_corridors
    Returns high-voltage transmission lines (69 kV to 765 kV), corridor capacity saturation, and 10-year regional grid growth forecasts near a project or location. Pass a project name, corridor name, city, or coordinates.
  • evaluate_utility_and_tariffs
    Returns the serving electric utility, EIA-861 retail industrial and commercial rates, large-load tariff schedules, queue delay risks, and demand flexibility options for a utility, project, or location.
  • query_fuel_and_generation_assets
    Finds natural gas pipelines, operating power plants, battery storage facilities, and retired brownfield power plant sites near a project or location. Pass a project name, city, state, or coordinates.
  • audit_environmental_and_site_gates
    Screens a project or site for flood zones, wetlands, airport airspace limits, watershed water stress, and natural hazard insurance risks. Pass a project name, city, or coordinates.
  • query_policy_zoning_and_pushback
    Checks a county, city, state, or project location for data center moratoria, zoning ordinances, regulatory review thresholds, and community opposition activity.
  • query_telecom_and_dark_fiber
    Finds long-haul and metro dark fiber routes, telecom carrier diversity, and distance to internet exchange points near a project or location. Pass a project name, city, or coordinates.
  • benchmark_market_and_ecosystem
    Returns wholesale electricity price benchmarks by ISO/RTO, compares data center developer portfolios, looks up organizations, tracks industry news, or screens critical equipment materials.
  • query_area_intelligence_summary
    Aggregates data center capacity, substations, transmission lines, gas pipelines, dark fiber, water stress, flood hazards, and moratoria within a radius or bounding box. Pass a city, coordinates, bounding box, or project name.
  • get_project_details
    Returns the complete dossier for a project across eleven sections: overview, siting and land, power and interconnection, energization ramp, 8760 load profile, behind-the-meter generation, electrical connection, capital, assessment, local re
  • search_projects
    Searches across all data center projects, campuses, phases, and queue filings using free text, natural-language sentences, typo-tolerant fuzzy matching, structured filters, or geographic proximity. Returns ranked matches with canonical IDs,

What the test does: it opens an MCP session (initialize) and asks for the tool list (tools/list), with no key or account. No tool is ever called. Learn more

Reviews

No review yet.

Sign in to leave a review. Your email is all you need.

Comments

No comment yet. A question, a tip? Start the discussion.

Sign in to comment.

Is this your project? Sign in to claim this entry.

Badge for your README

io.aixenergy/map on L’Agora

Show that your project is listed (and tested, if it responds): paste this code in your README. The badge follows the latest test and links back to this entry.

Markdown (GitHub)

[![io.aixenergy/map on L’Agora](https://lagora.dev/badge/io.aixenergy/map.svg?lang=en)](https://lagora.dev/en/entry/io.aixenergy/map)

HTML

<a href="https://lagora.dev/en/entry/io.aixenergy/map"><img src="https://lagora.dev/badge/io.aixenergy/map.svg?lang=en" alt="io.aixenergy/map on L’Agora" height="20"></a>

Promote

For the entry’s author only: sign in to continue.

Report this entry