BRAINIAC Construction Site Operations
software.brainiac/construction-site-operations
Paid Construction Site Operations API via x402. Unpaid tool calls return 402.
Is this your project? Claim this entry to answer questions, hear about reviews and appear as the author.
- Website
- www.brainiac.software/
- Server address
https://www.brainiac.software/mcp/construction-site-operations(streamable-http)- Version
- 1.0.1
- Author
- brainiac.software (namespace verified by the registry)
- Source
- Official MCP registry (updated Nov 20, 2026)
Reviews
No review yet.
Sign in to leave a review. Your email is all you need.
Questions for the author
No question yet.
Sign in to ask the author a question. The author has not claimed this entry yet: they will only be told if they claim it. Other members can answer.
How to install it
Claude Code
In a terminal:
claude mcp add --transport http construction-site-operations https://www.brainiac.software/mcp/construction-site-operationsClaude (app and claude.ai)
Open Settings, then Connectors, and add a custom connector with this address. If the server asks you to sign in, Claude will walk you through it.
https://www.brainiac.software/mcp/construction-site-operationsChatGPT
In Settings, Apps & Connectors section, turn on developer mode, then create a connector with this address.
https://www.brainiac.software/mcp/construction-site-operationsCursor ~/.cursor/mcp.json
Add this to ~/.cursor/mcp.json (or .cursor/mcp.json in the project):
{
"mcpServers": {
"construction-site-operations": {
"url": "https://www.brainiac.software/mcp/construction-site-operations"
}
}
}VS Code .vscode/mcp.json
Add this to your project’s .vscode/mcp.json:
{
"servers": {
"construction-site-operations": {
"type": "http",
"url": "https://www.brainiac.software/mcp/construction-site-operations"
}
}
}These configurations are built from the information published by the author. Check the repository before installing a local server.
Our test
Responds The server speaks MCP and lists its tools.
- Date
- Nov 28, 2026, 09:54 (test run by L’Atlas)
- Response time
- 777 ms (whole test)
- Tools found
- 9
- Announced name
- software.brainiac/construction-site-operations 1.0.0
- Protocol
- MCP 2025-11-25
- Next test
- Dec 5, 2026
See the tools (9)
construction-site-operations_daily-report-parse
Copy supplied daily reports into structured rows with dates, locations, authors, workforce, and referenced activities. Docs: https://www.brainiac.software/api/construction-site-operations/daily-report-parse Keywords: when reviewing site proconstruction-site-operations_progress-analyze
Compare supplied baseline and actual activity dates to identify schedule deviations. Docs: https://www.brainiac.software/api/construction-site-operations/progress-analyze Keywords: when reviewing site progress or a change, text, csv, file,construction-site-operations_delay-event-detect
Collect recorded delay rows and daily-report delay wording, and separately label impacts inferred from baseline versus actual dates. Docs: https://www.brainiac.software/api/construction-site-operations/delay-event-detect Keywords: when reviconstruction-site-operations_request-for-information-track
Track RFI asked/due/answered dates and identify unresolved or overdue items from supplied statuses. Docs: https://www.brainiac.software/api/construction-site-operations/request-for-information-track Keywords: when reviewing site progress orconstruction-site-operations_instruction-extract
Extract dates, issuers, locations, referenced activities, and change flags from supplied site instructions. Docs: https://www.brainiac.software/api/construction-site-operations/instruction-extract Keywords: when reviewing site progress or aconstruction-site-operations_material-delivery-reconcile
Reconcile expected and delivered material records, flagging missing deliveries and short quantities from supplied dates and counts. Docs: https://www.brainiac.software/api/construction-site-operations/material-delivery-reconcile Keywords: wconstruction-site-operations_change-impact
Compare change instructions with supplied scope and programme dates. Docs: https://www.brainiac.software/api/construction-site-operations/change-impact Keywords: when reviewing site progress or a change, text, csv, file, reports, activitiesconstruction-site-operations_report
Combine daily reports, progress deviations, recorded and inferred delays, RFIs, instructions, deliveries, and change comparisons from supplied site records. Docs: https://www.brainiac.software/api/construction-site-operations/report Keywordcontact_us
How to contact BRAINIAC.software support: email, page URL, what to include in a message, and what not to send. Free. Does not send email.
What the test does: it opens an MCP session (initialize) and asks for the tool list (tools/list), with no key or account. No tool is ever called. Learn more
Cite this entry
For an article or comparison, use this permanent link and include the test date. The description comes from its source; reviews belong to members. A successful test is not a security audit.
BRAINIAC Construction Site Operations · L’Agora · Tested on
[BRAINIAC Construction Site Operations — L’Agora](https://lagora.dev/en/entry/software.brainiac/construction-site-operations)
Comments
No comment yet. A question, a tip? Start the discussion.
Sign in to comment.
Badge for your README
Show that your project is listed (and tested, if it responds): paste this code in your README. The badge follows the latest test and links back to this entry.
Markdown (GitHub)
[](https://lagora.dev/en/entry/software.brainiac/construction-site-operations)HTML
<a href="https://lagora.dev/en/entry/software.brainiac/construction-site-operations"><img src="https://lagora.dev/badge/software.brainiac/construction-site-operations.svg?lang=en" alt="software.brainiac/construction-site-operations on L’Agora" height="20"></a>For the entry’s author only: sign in to continue.
By the same author
BRAINIAC WordPress Fleet Intelligence Responds
BRAINIAC Web Technology Fingerprinting Responds
BRAINIAC Web & Page Intelligence Responds
BRAINIAC Wallet Intelligence Responds